Melton South Building
Inspections

Termite collars at the slab in Melton South

Fitted once, before the pour, or never at all.

Owner Inspections · Melton South 3338 · 2026-02-24

In short: The collar around each slab penetration is the one termite defence that cannot be retrofitted.

What a collar does

It seals the gap where a pipe passes through the slab, closing a route termites would otherwise use undetected.

Why timing is absolute

The penetration is cast into concrete. Once poured, there is no way back to it.

What we have found

Collars missing from all or some plumbing penetrations at Melton South pours.

How to check

Ask to see them before the pour, or book the slab inspection and have it recorded.

What else sits at slab

Vapour barrier position, mesh support, cover and N16 bars around penetrations.

Written by the Owner Inspections team from inspections carried out in Melton South. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Melton South

All guides →

Book a building inspection in Melton South

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Melton South owners ask about this

Can a collar be added later?

Not readily, because the penetration is set in concrete.

Is it required?

It is part of the termite management system for the building.

Who fits it?

The plumber or the termite installer before the pour.

Would I notice it missing?

Only if you were looking for it on the day.

CallGet a Free Quote