Melton South Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Fixing stage inspection in Melton South

Mouldings, doors and joinery are in and painting is next. Anything caught now is fixed before paint rather than cut back after.

  • After mouldings, doors and joinery, before the painter
  • 1 to 2 hours on site
  • Report within 24 hours
Price a Melton South inspectionA minute to fill in, and nothing is locked in.

Fully licensed & accredited

Stage5 of 7
When to bookAfter mouldings, doors and joinery, before the painter
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Melton South fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Melton South builds

Infills around window and door heads are the recurring Melton South item, along with expansion joints left unsealed and plaster not brought flush at the garage.

What we find at this stage in Melton South

  • Window head and side infills incomplete
  • Infill or caulking missing at door heads and sides
  • Expansion joints not sealed with mastic
  • Plaster not flush at the garage wall
  • Skirtings bowed
  • Door jambs and architraves not finishing above floor level
Door jambs and architraves not finishing above floor level, Melton South
Door jambs and architraves not finishing above floor level
Sample findings

Sample defects found during our fixing inspections in Melton South

Annotated findings from Fixing inspections on Melton South builds. Client addresses withheld.

Window head and side infills incomplete, noted during a fixing inspection in Melton South
Window head and side infills incomplete
Infill or caulking missing at door heads and sides, noted during a fixing inspection in Melton South
Infill or caulking missing at door heads and sides
Expansion joints not sealed with mastic sealant, noted during a fixing inspection in Melton South
Expansion joints not sealed with mastic sealant
Plaster not brought flush at the garage wall, noted during a fixing inspection in Melton South
Plaster not brought flush at the garage wall

The other stages of a Melton South build

  1. Bored piers inspection in Melton South1Bored piersAfter boring and cage placement, ahead of concrete
  2. Slab pre-pour inspection in Melton South2Slab pre-pourThe day before the pour, with steel, pods and formwork open
  3. Frame inspection in Melton South3FrameOnce frame and trusses are up and the roof is on, before sarking
  4. Lock-up (pre-plaster) inspection in Melton South4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Waterproofing inspection in Melton South6WaterproofingOnce the membrane is on and cured, before tiling
  6. Pre-handover (PCI) inspection in Melton South7Pre-handover (PCI)Roughly a week ahead of practical completion

All construction stage inspections in Melton South →

Guides

Construction stage guides for Melton South

All guides →

Book a fixing inspection in Melton South

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Melton South: common questions

Why do infills matter?

They close the gap above and beside an opening. Left incomplete, the gap is either visible forever or filled badly after paint.

Worth a separate visit?

If budget allows. Items caught before paint are cheap to fix.

Which standard?

The Guide to Standards and Tolerances 2015 for alignment, gaps and finish.

Do you look at joinery?

Yes, alignment, gaps and hardware worked by hand.

What is excluded?

No appliance testing, no energising, no commissioning.

How long on site?

Around two hours for a typical Melton South home.

CallGet a Free Quote