Bored piers
After boring and cage placement, ahead of concrete
Depth and diameter against the engineering, cage position and cover, and bases clear of water or spoil
Learn more about the bored piers inspection →Seven points on a Melton South build where the next trade is about to cover the last. We attend before that, measure what is there against the engineering for your lot, and give you something the supervisor can act on.
What repeats here sits under the slab and inside the walls: termite collars left off penetrations, vapour barrier laid over the steel instead of under it, and insulation left out of bridging points nobody opens up again.

After boring and cage placement, ahead of concrete
Depth and diameter against the engineering, cage position and cover, and bases clear of water or spoil
Learn more about the bored piers inspection →
The day before the pour, with steel, pods and formwork open
Termite collars at every penetration, vapour barrier beneath the steel not over it, mesh fixed and not sagging, cover maintained, N16 bars at penetrations and beam widths consistent
Learn more about the slab pre-pour inspection →
Once frame and trusses are up and the roof is on, before sarking
Fly bracing to cut off trusses, bottom plate overhang at the slab edge, slab edge rebate condition, honeycombing, nogging spacing and capped waste pipes
Learn more about the frame inspection →
After roof, cladding and external doors, before plaster
Sarking complete and secured including the garage to house wall, insulation batts in place, bridging points filled, pipes secured and sewer pipes capped
Learn more about the lock-up (pre-plaster) inspection →
After mouldings, doors and joinery, before the painter
Window and door head infills, expansion joints sealed, plaster flush at the garage, skirting straightness and door jamb finish above floor level
Learn more about the fixing inspection →
Once the membrane is on and cured, before tiling
Membrane through every wet area, shower recess formed and trimmed, falls to waste and junctions sealed
Learn more about the waterproofing inspection →
Roughly a week ahead of practical completion
Slab cracking measured, wall straightness against the 5mm tolerance, capping fixing method, mixers and water hammer, and every joint caulked
Learn more about the pre-handover (PCI) inspection →One finding from each stage of a Melton South build, in the inspector's wording.







Pre-Handover (PCI) Inspections The inspection before keys, where cracks and tolerances get measured instead of argued about.
Pre-Purchase Building Inspections What a western corridor home is really like behind the presentation, under AS 4349.1.
Building and Pest Inspections Building and timber pest together, starting with whether the termite notice exists at all.
Defect Investigation Reports Measuring what failed against what was required, so the discussion stops being a matter of opinion. Instant online pricing, or talk to the booking team on 1300 471 805.
Frame and pre-handover before anything else, then slab pre-pour. The slab matters because termite collars, vapour barrier and mesh position are all permanent the moment concrete is placed.
Our inspectors work by eye and by hand. Electrical work is not energised or tested, plumbing is not pressure tested, nothing is opened destructively, no engineering is certified and no soil is sampled.
A day or two out is usually workable. Tell us the moment the supervisor gives you a date, because they shift.